Fixed
A pothole has appeared on the A4097 where it crosses the River Tame
Reported in the Pothole category anonymously at 13:25, Wed 4 March 2015
Sent to Warwickshire County Council 5 minutes later. FixMyStreet ref: 598904.
The A4097 crosses the River Tame just after the Hemlingford Green island. this part of the A4097 locally known as the Kingsbury mile was i believe completely resurfaced in March 2013. However the road surface that spans the bridge floor is always failing with a huge pot hole appearing shortly after the resurfacing was finished. A temporary repair was made last year but the the temporary repair in now failing and cars are swerving to avoid the hole. Also some of the road surface has come away from where the road meets the bridge joint. This has recently been filled in but not to a high standard i.e the repair is not flush with the road surface nor flush with the bridge joint.
Updates
-
Warwickshire County Council has received your report which will be reviewed accordingly. There are no automatic updates to the status of this report - this is something we are working on as part of the improvements to fault reporting
Posted by countyhighways@warwickshire.gov.uk at 13:05, Thu 5 March 2015
-
Still open, via questionnaire, 23:59, Tue 7 April 2015
-
Still open, via questionnaire, 10:13, Wed 6 May 2015
-
On turning right from Kingsbury village and exiting the island onto the 4097 my car hit this pothole and today 18/5/15 have had to have £99 worth of repairs as it has affected the steering alignment of my vehicle.Where can i make a claim for this?
Not sure why the March entry is still on there as it hasn't been like that since March this has emerged over the last 2-3 weeks
Posted anonymously at 14:36, Mon 18 May 2015
-
Still open, via questionnaire, 15:30, Wed 3 June 2015
-
Still open, via questionnaire, 16:05, Wed 1 July 2015
-
Still open, via questionnaire, 17:18, Wed 29 July 2015
-
29.07.15 Although the potholes have been filled in over the last couple of the days, the actual repair to the deck of the bridge which was scheduled for the summer months had not yet taken place.
Posted anonymously at 17:18, Wed 29 July 2015
-
Still open, via questionnaire, 17:03, Sun 6 September 2015
-
Questionnaire filled in by problem reporter; State changed to: Fixed, 08:10, Tue 6 October 2015
-
Questionnaire filled in by problem reporter
State changed to: Fixed
Posted anonymously at 08:10, Tue 6 October 2015
This report is now closed to updates from the public. You can make a new report in the same location.