Back to all reports

Bridge by the sewage works is not there

Reported in the Bridge or culvert defect category anonymously at 09:07, Sun 4 August 2019

Sent to Warwickshire County Council 3 minutes later

I tried to walk the footpath SS36c? from Middle Tysoe to Lower Tysoe that goes by the sewage works and met with several obstructions.

The sign on the gate was missing. Over the first stream the hedge branches could only just be forced through. They need cutting back because they obstruct passage and obstruct the fact that there is a plank bridge over a ditch.

Then at the sewage works I pushed through the brambles etc which were growing across the path and through the fence of the sewage works up to head height.

Then there was no crossing at the stream. I retraced my steps through a field with a bull, which I had hoped to do only once.

I believe that the farm is in council ownership.

I haven't walked this footpath for some time so don't know how long the issue’s been present.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Provide an update

Please note that updates are not sent to the council. Your information will only be used in accordance with our privacy policy

Next: Tell us about you

Your update

Tell us about you

Do you have a FixMyStreet password?